SG Series 30 & 40 kVA
How to access the terminals for the cable connections.
D
Bottom entry cables
Top entry cables
A
B
C
E
!
before drilling any wholes.
Please remove the plate "E & F"
SGUL_
030-04
0_UPS
connec
tion_01
US
F
Fig. 3.8.1-2 Access to the input / output connections of SG Series 30 & 40 kVA
To access input, output and Battery connections proceed as follows:
• Remove protection panel “A”.
• Remove protection panel “B”.
• Remove UPS side panel “C”.
• Only for Dual Input Utility:
Remove with appropriate tool the metallic window “D” from the metal screen “C”.