SG Series 30 & 40 kVA
How to access the terminals for the cable connections.

D

Bottom entry cables

Top entry cables

A

B

C

E

!

before drilling any wholes.

Please remove the plate "E & F"

SGUL_

030-04

0_UPS

connec

tion_01

US

F

Fig. 3.8.1-2 Access to the input / output connections of SG Series 30 & 40 kVA

To access input, output and Battery connections proceed as follows:

• Remove protection panel “A”.
• Remove protection panel “B”.
• Remove UPS side panel “C”.
• Only for Dual Input Utility:

Remove with appropriate tool the metallic window “D” from the metal screen “C”.