7 epo (emergency power off) input contact, Epo (emergency power off) input contact, Jp3 xb j2 – GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Installation Guide User Manual

Page 44

Advertising
background image

4.1.7 EPO (Emergency Power Off) input contact

Be aware:

The reliability of the system depends on this contact NC (Normally Closed)!

An external Emergency switch (Normally Closed voltage-free

contact) can be connected on terminals XB / 1 - 4 or connector
J2 / 12 - 25 of the P4 - Interface Customer.

NOTE !

To enable this function, remove cable short-
circuiting XB / 2 -
3 on the Terminal XB and the
Jumper JP3 on P4 – Customer Interface
, when
the cables have been already connected on XB
or J2
.


When opened, this contact causes the immediate opening of the

Contactors K3, K4, K6, K7 and K8, as well as the shutdown of
Rectifier, Inverter and Static-Switch.

4

1

3

2

3

2

1

SG

T

50

00_

100-1

50_

C

u

s

tomer i

n

te

rf

a

c

e E

P

O

_

0

1

4

JP3

XB

J2

Fig. 4.1.7-1 Terminals for connection EPO

NOTE !

This procedure could imply a load shutdown.


NOTE !

In case of parallel Customer Interface the EPO contact must be connected to one
Customer Interface
only, but the bridge on X2 and jumper JP3 on the P4 – Customer
Interface
must be removed on all other boards.


In a parallel system a separate NC (Normally Closed) contact must be connected
individually to each unit.



When the EPO has been activated, the system must be restored as follows:

Press the push-button EPO (contact on X7 / 1, 2 is closed again).

Press the key O (inverter off – see Section 5.2 – Operating Manual) on the control panel.

In case of a parallel system press the key “O” (inverter off) on the control panel of
each unit connected on the parallel bus and having its output switch Q1 closed.

Modifications reserved

Page 44/45

OPM_SGS_ISG_10K_40K_0US_V040.doc

Installation Guide SG Series 10 –20 – 30 - 40 kVA

Advertising