GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Installation Guide User Manual

Page 28

Advertising
background image

3.8.3 Power connection with common input utility of SG Series 30 & 40 kVA

L1-1

X1

RECTIFIER

1 -

INPUT

L1

LOAD

PE

PE

SGT

5000

_030

-040_

UP

S c

onn

e

c

ti

on

com

m

o

n_0

1U

S

L2

L3

N

L2-1

L3-1

N

OFF

ON

O FF

ON

&
BYPASS

Fig. 3.8.3-1 Power connections Common Input Utility of SG Series 30 & 40 kVA

SG Series 30 & 40 kVA

Max. rating X1 terminals:

1 AWG (50mm

2

)

Common Input Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A

L2-1

Rectifier + Bypass Phase B

L3-1

Rectifier + Bypass Phase C

N

PE

Neutral

Ground

Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE

Load Neutral

Load Ground

The interconnection links BR1, BR2 and BR3 MUST REMAIN CONNECTED.
Cable terminations are to the Rectifier Input Terminals and Output Terminals as shown above.
Connect wire to the Terminals using appropriate tools and appropriate torque.
Torque specification for Input / Output and DC power connections on Terminals: see Section 3.8.1.

NOTE !

This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.

Modifications reserved

Page 28/45

OPM_SGS_ISG_10K_40K_0US_V040.doc

Installation Guide SG Series 10 –20 – 30 - 40 kVA

Advertising