WIRING
Wire sizing according to
NEC Section 210-20 (a) Table 310-16
Use 75°C (167°F) copper wire

Wiring requirements:
AC INPUT RECTIFIER:

3-Phase, 3 wire plus Ground

AC INPUT BYPASS:

3-Phase, 4 wire plus Ground

AC OUTPUT:

3-Phase, 4 wire plus Ground

DC INPUT:

2 wire (positive and negative) plus Ground





Maximum cable diameter that terminals can accept

Refer to torque specifications table for torque requirements

UPS rating

Rectifier Input Bypass Input

DC Input

AC Output

GND

SG Series 10 kVA

3 AWG

3 AWG

3 AWG

3 AWG

3 AWG

SG Series 20 kVA

3 AWG

3 AWG

3 AWG

3 AWG

3 AWG

SG Series 30 kVA

1 AWG

1 AWG

1 AWG

1 AWG

1 AWG

SG Series 40 kVA

1 AWG

1 AWG

1 AWG

1 AWG

1 AWG