2 layout, 1 layout sg series 10 & 20 kva, Layout – GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Installation Guide User Manual

Page 9: Layout sg series 10 & 20 kva

Advertising
background image

2 LAYOUT

2.1 LAYOUT SG Series 10 & 20 kVA

S

G

T

50

00

_01

0-

02

0_

U

P

S_G

E

_02

Fig. 2.1-1 SG Series general view

SGT

5000

_010-0

20_U

PS_GE_03

Fig. 2.1-2 SG Series general view with open doors

Modifications reserved

Page 9/45

OPM_SGS_ISG_10K_40K_0US_V040.doc

Installation Guide SG Series 10 –20 – 30 - 40 kVA

S

G

T

500

0_010

-020_U

P

S

_GE

_04

4

1

2

5

CR

XA

XB

3

Fig. 2.1-3 SG Series general view with optional 5

th

harmonic filter

and removed protection panels

1

Opening for top cable entry

2

Opening for bottom cable entry

3

Terminals for Utility input and
load output

4

Terminals for external Battery
connection

5 Battery

Shelf

CR Connectivity

Rack

XA Terminals for 24VDC Auxiliary

Power Supply connection

XB Terminals for EPO connection

Advertising