Page 40: Control bus cables routing

Advertising
background image

S

G

T

50

00

_0

30

-0

40

_R

P

A

c

o

nt

rol bus

cable_02US

Next parallel

unit 3, 4, 5, 6, 7,

8

JB2

JA2

UPS 1

JA1

JB1

JA1

JB1

JB

JA

JB1
JB2

JB

JA

JA2

JA1

JA2

UPS 2

Q2

Q1

OFF

ON

OFF

ON

JB2

A

A

ON

OFF

Q1

Q2

ON

OFF

Fig. 3.9.3-3 Control Bus cable routing and connection

Control bus cables routing

Place and fix the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 with the appropriate clamps inside
the UPS cabinets in the position shown in the drawing Fig 3.11-1/2/3.

Pay attention to the fact, that routing of cables shall allow the removal of the protection covers A.

NOTE !

Pay attention when cabling and routing the bus cables JA and JB inside the UPS
cabinet.
In case one unit should be removed from the parallel system, the bus cables JA
and
JB
must be removed from the cabinet without disconnecting them from the metal
plate where the sockets JA
and JB are located.

For reliability reasons the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 connecting the units should
be run in separated protected conduits (as indicated in Fig. 3.11-3) separated from the power cables.

It is important that the cable JA must be the same length as cable JB.


WARNING !

Connection and commissioning of an additional UPS to an existing parallel system,
must be performed by a service engineer from of your

Service Center.