10

G9000 Installation and Operation Manual

In the event of a load overcurrent, the UPS transfers to bypass without interruption to the critical

load. In the case of the Parallel Operation, all UPS will transfer to bypass without interruption to the

critical load.

The internal control system determines the operation of the two paths, with the load powered from

the inverter being the normal operation.

C) Battery operation: Load Power supplied by UPS battery.

FIGURE 1.3 Single Line Diagram - Battery Operation

Figure 1.3 shows that in the event of AC input source failure or interruption, the UPS

Converter(s)* will de-energize and the UPS battery(s)* will immediately discharge and supply DC

power to the Inverter to maintain continuous AC power to the load. This operation will continue until:

a) The battery capacity expires and the inverter turns off, or

b) Input power is restored. (When input power is restored the converter will simultaneously

power the inverter and critical load, and recharge the batteries.)

A fully charged battery will provide power for the specified time at the rated load, or longer, at a

reduced load.

(s)* : In the case of the Parallel Operation

UPS Module

Power Flow

Not in Use

AC

input

CB

CB3

CONVERTER

/ CHARGER

INVERTER

Output

52C

CB1

External

BATTERY

User Supplied

MCCB

Static Transfer

Switch

52S

CB2

Battery Cabinet

Bypass

input

CB

User Supplied

MCCB