Procedure for cable connections – MaxPower Corp Toshiba G9000 Series User Manual

Page 48

Advertising
background image

38

G9000 Installation and Operation Manual

D) External Battery Supply

Please refer to the following when installing and maintaining batteries:

1. The customer shall refer to the battery manufacturer's installation manual for

battery installation and maintenance instructions.

2. The maximum permitted fault current from the remote battery supply, and the

DC voltage rating of the battery supply over-current protective device are

shown in Table 3.3.

TABLE 3.3 Maximum Permitted Fault Current

UPS Capacity

(kVA)

DC Voltage

Rating (V)

Maximum Fault

Current Permitted (A)

80

480

25,000

100

480

25,000

160

480

25,000

225

480

25,000

3.3

PROCEDURE FOR CABLE CONNECTIONS

1.

Confirm the capacity of the UPS being installed. Identify the input/output power

terminal blocks as shown in the appropriate Figures 3.1 through 3.3.

2.

Connect the internal control wire and power wire.

(1) Control wire Inter-connect

1.

CB2 UVT to terminal TN1

-

1, 2 of external I/F PCB IOAU-09.

2.

CB2 ON Auxiliary to terminal TN1

-

3, 4 of external I/F PCB IOAU-09.

(2) Power wire (AC input, Bypass input, AC output) Inter-connect

a.) From user’s distribution panel

1. X1 (A-phase) to A bus bar in UPS

2. X2 (B-phase) to B bus bar in UPS

3. X3 (C-phase) to C bus bar in UPS

b.) DC Input to UPS

1.

Positive cable to BP bus bar in UPS

2.

Negative cable to BN bus bar in UPS

!

NOTE

Advertising