Alliance Laundry Systems Drying Cabinet User Manual

Page 41

Advertising
background image

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

Electrical Requirements

39

70304601

200-220 Volt/60 Hertz/
1 Phase

2W&G

200 Volt/50 Hertz/
1 Phase

2W&G

(T30 Models Only)

100 Volt/60 Hertz/1 Phase INTERNATIONAL Models:
2W&G

100 Volt/50 Hertz/1 Phase INTERNATIONAL Models:
2W&G

1. Prior to connecting electric service, locate transformer configuration jumper

in junction box area.

2. Remove the 208 Volt jumper and replace it with the 100 Volt jumper located

in the literature packet from cylinder.

3. Remove small access cover from back of the fan motor. Locate the two

internal jumper wires, brown and blue connected to motor terminals #6 and
#2. Move brown wire from terminal #6 to terminal #2 and blue wire from
terminal #2 to terminal #4. Be careful not to confuse light blue motor harness
wire with the dark blue internal jumper.

4. Carefully check motor wire connections with wiring diagram and verify that

the motors are configured for low voltage operation before replacing covers.

5. Repeat steps 1 through 4 for each upper and lower unit.

6. Sign and date conversion sticker located on back of tumbler.

7. Follow the instructions covered in Connecting Electrical Service section.

380 Volt/50 Hertz/
3 Phase

3W&G

(T30 Models Only)

400-415 Volt/50 Hertz/3 Phase Models:
3W&G

1. Prior to connecting electric service, locate transformer configuration jumper

in junction box area.

2. Remove the 380 Volt jumper and replace it with the 415 Volt jumper located

in the literature packet from cylinder.

3. Repeat steps 1 and 2 for each upper and lower unit.

4. Sign and date conversion sticker located on back of tumbler.

5. Follow the instructions covered in Connecting Electrical Service section.

If serial plate voltage is:

Tumbler can be converted to the following voltages:

Advertising