Chapter 2 installation, Chapter 2, Installation -1 – ADTRAN TSU 120e User Manual

Page 29: Unpack, inspect, power up -1, Installation

Advertising
background image

61202129L1-1

TSU 120 User Manual

2-1

Chapter 2

Installation

UNPACK, INSPECT, POWER UP

Receipt Inspection

Carefully inspect the TSU 120 for any shipping damages. If
you suspect damage, file a claim immediately with the carrier
and then contact ADTRAN Customer Service (see inside the
last page of this manual). If possible, keep the original ship-
ping container for use in shipping the TSU 120 back for repair
or for verification of damage during shipment.

ADTRAN Shipments Include

The TSU 120

Two-line interface cable: an 8-position modular to 8-posi-
tion modular (15 ft.)

Loopback plug

DB 15 to RJ adapter

DB 25 to RJ adapter

An 8-position modular cable for connection to the chain-in
port (6 ft.)

The TSU 120 and TSU 120e User Manuals

Customer Provides

Cables for any expansion modules to be used with the TSU
120

10BaseT cable for connection to a LAN or router, if you plan
to use remote management features (TSU 120e only)

Advertising
This manual is related to the following products: