HP Hitachi Dynamic Link Manager Software Licenses User Manual

Page 489

Advertising
background image

Message

ID

Message Text

Explanation

If you want to continue

processing the offline operation

of the HDLM command for other

paths, enter y. If you want to

terminate processing, enter n. For

details on the offline operation,

see

offline (Places Paths Offline)

on page 6-6

.

KAPL01055

-I

All the paths which pass the

specified aa...aa will be changed to

the Offline(C) status. Is this OK?

[y/n]:

Details

Multiple paths will be collectively

set to Offline(C) because the -
hba or -cha parameter was

specified. To collectively set

multiple paths to Offline(C), enter
y. To cancel the operation, enter
n.
aa...aa: CHA port, HBA

Action

If you want to execute offline

processing for the paths that

meet the specified requirements,

enter y. If you want to terminate

processing, enter n.

KAPL01056

-I

If you are sure that there would be

no problem when all the paths

which pass the specified aa...aa are

placed in the Offline(C) status,

enter y. Otherwise, enter n. [y/n]:

Details

This message re-asks the user

whether they want to set all the

paths to Offline(C). To set all the

paths to Offline(C), enter y. To

cancel the operation, enter n.
aa...aa: CHA port, HBA

Action

If you want to execute offline

processing for the paths that

meet the specified requirements,

enter y. If you want to terminate

processing, enter n.

KAPL01057

-I

All the paths which pass the

specified aa...aa will be changed to

the Online status. Is this OK?

[y/n]:

Details

Multiple paths will be collectively

placed Online because the -hba

or -cha parameter was specified.

If you want to continue, enter y.

To cancel the operation, enter n.
aa...aa: CHA port, HBA

Action

If you want to execute online

processing for the paths that

meet the specified requirements,

Messages

8-13

Hitachi Dynamic Link Manager (for Solaris) User Guide

Advertising
This manual is related to the following products: