3 installing the tape library, Installing the expansion frame, Installing the tape library – HP NonStop G-Series User Manual

Page 29

Advertising
background image

L700 (CTL700) Installation and User’s Guide 527338-004

3 -1

3

Installing the Tape Library

This section covers:

Installing the Expansion Frame

Follow these procedures to install an expansion frame for the tape library.

The tape library expansion frame adds 294 cartridge storage locations to the tape
library. This installation procedure should take about two hours.

1. Use a flat blade screwdriver to remove any theta stops from positions 1 and/or 3.

Refer to

Figure 3-1

. Only one theta stop should remain—the theta stop in position

2 (full capacity).

Installing the Expansion Frame

3-1

Tape Library Operating Options

3-6

Installing Cables

3-7

Connecting the Tape Library Power Cable

3-10

Terminate the SCSI Bus

3-12

After Installation is Complete

3-12

Note. The tape library automatically configures for 1/3, 2/3, or full capacity when the it is
powered on and the firmware is loaded. If the theta stops are not in the correct position, an
error results.

Caution. Two or more people are required to remove the expansion frame from its shipping
package and install the expansion frame.