Load configuration, Run configuration, Meter prime – Ag Leader Integra Users Manual User Manual

Page 326: Load configuration run configuration, Onfiguration

Advertising
background image

310

Firmware Version 5.4

5. Press

to start the process of adding components to the fertilizer blend.

Note: Any liquid herbicides set up within the system can be added to create an impregnated blend product.

6. Select the desired component from the list box. New components can be set up at this time if required.

7. Enter the amount of the first component.

8. Press

to start adding an additional component. (A dry mix can contain up to seven individual

components.)

9. The remaining Base Amount that is available after adding product components is shown at the bottom
of the on-screen list box.

10. Enter Manufacturer name if applicable. Press

to enter a unique name for the blend.

11. Press

to complete the process of setting up the dry blend. The new Dry Blend now appears

in the Product List.

L

OAD

C

ONFIGURATION

Press: Select Event button.

Select a Season, Grower, Farm, and
Field on the Management Selection

screen.

For more information, see

“Setup Event” on page 45

.

R

UN

C

ONFIGURATION

Once a configuration has been completed, the Map View button appears at the bottom of the
Home screen. Press the Map View button to see the Map screen. The map below is displayed
in Zoom to Detail view.

Meter Prime

Meter Prime is for Hydraulic Drives ONLY.

Press the Strip Till Control button.

Strip Till Control button

Select Event

0.00

ac

0.0

mph

0.00
0.00

0.00
0.00

0.00
0.00

MAP

Potash

N/A

lb/ac

lb/ac

lb/ac

20

15

15

3500

1 2 3

Start

Prime

RPM

1

2

3

3500

20

15

15

RPM

Advertising