Figure 2-8: Parallel Configuration for Increased Capacity (Four UPSs)

These configurations have an external System Bypass Cabinet (SBC).

UPS 2

UPS 1

UPS 4

UPS 3

Blue
plug

Red
plug

n

o

m

m

o

C

UPS 1

SBC

TB2

UPS 2

UPS 4

UPS 3

Blue
plug

Red plug

Interconnections with the external system
bypass cabinet (20):
◗ Interconnect terminals 7, 8, 9, and 10 on the
auxiliary terminal block TB2 in the system
bypass cabinet to UPS terminal blocks
XMS04/XMS05 pins 1, 2, 3, and 4 respectively.
◗ Create a loop connection between the cabinet
and the UPSs as shown in Figure 2-8.

Details of terminal block connections.

Note: The interconnection cables for the
SBC are not supplied

Note: The supplied cables are 33 ft long.
To ensure sufficient isolation of
exchange-current, CAN and external
bypass cabinet cables, they must be run
separately from the power cables.

Exchange-current interconnections (19):
Use the XMS02 and XMS03 connectors to
create a loop between the UPSs (all the XMS02
and XMS03 connectors must be used).
CAN // interconnections (21):
Daisy-chain the UPSs using the XMS06
and XMS07 connectors. Fit a blue plug on the
first UPS unit and a red plug on the last UPS
(all the XMS06 and XMS07 connectors must
be used).

7 8

9

8

7

10

3

2

1

4

9

10

PCA INTN

19

19

19

19

20

20

TB2

4

3

2

1

20

20

21

21

21

21

PCA INTN

9

8

7

10

3

2

1

4

SBC

XMS04 /

XMS05

MGE Galaxy 5000

Setup and Installation

2 — 6

86-174010-00 B00

Advertising