24.8.2. Time interval between changing dosage thresholds

By setting <P7.4.2 DELAY> parameter users can set a delay time
between changing dosing thresholds.

Procedure:

• Enter

<P7 WORK MODES> and then:

• Using numeric keys inscribe the required value (0 to 60 s)

and confirm by pressing

.


Return to weighing:

See 11.3.



24.8.3. Time interval completing process

Users can set <P7.4.3 CHUTE TIME> parameter to change time
of completing a process of dosing after indication drops below LO.

Procedure:

• Enter

<P7 WORK MODES> and then: