Lull 944E-42 Service Manual User Manual

Page 42

Advertising
background image

Boom

3-12

944E-42

2. Place the extend chain and clevis, as an assembly

on top of the third boom section and allow the chains
and clevis to overhang the boom head. DO NOT
allow the chain to twist or kink.

3. At the rear of the boom, attach the retract chain (10)

to the same hole in the anchor link (11) with the
previously used hardware. Loctite

®

242™ and torque

to 37-66 lb-ft (50-90 Nm).

4. Install the top, side and bottom wear pads (12) to the

rear of the third boom section.

5. Grease the sections of the boom in areas where the

wear pads will slide.

6. Using a suitable overhead lifting device and sling,

carefully slide the third boom section into the second
boom section.

7. Install the bottom wear pads at the front of the

second boom section.

8. Slide the third boom section into the second boom

section. Remove the sling.

9. Install the extend chain yoke to the third boom

section. Coat the clevis pin (13) with anti-seize
compound.

10. From the rear of the boom, push the attachment tilt

and auxiliary hydraulic hoses (14) through the third
boom section along the hose guides. Leave enough
hose out of the back of the boom for the Extend/
Retract cylinder to be installed.

11. Use a suitable overhead lifting device and sling to

carefully raise and position the Extend/Retract
cylinder into the rear of the third boom section.
Readjust the sling as needed to help balance the
cylinder in the sling during installation.

MU0261

10

11

MU5061

12

MU1211

13

MU0221

14

Advertising