Operations – Snorkel XT24SD-sn000001+ User Manual

Page 11

Advertising
background image

1/31/2008

- 15 -

OPERATIONS

Towing Procedure

Requires 2 inch (50.8 mm) ball and
coupler hitch.

Attach the trailer chains to the towing
unit, put one chain over another under
the tongue

Unit can be towed by any large or small
vehicle, including ATV or golf cart for
use at various locations

Your PLE scissors lift is designed to be towed at highway speeds according to
the laws in your state.

Steps to folding down Collapse Rails









Step 1- Remove pull pins from front two crossbars and rear crossbar
Step 2- Fold rear crossbar to warning sticker side rail
Step 3- Fold two front rails back to a 45 degree angle








Before

After

Advertising