Set up the blower – Condux Deluxe Blower User Manual

Page 11

Advertising
background image

11

Set Up the Blower

This manual contains setup and operating instructions for the Deluxe Blower with
job box.

ImPORTANT: The Deluxe Blower must not be located below overhead gantries,
power lines or walkways where there might be a risk of falling objects. The operator
must be wearing recommended protective gear before operating the blower.
Operating light levels should be at least 200 lux of light intensity.

A. ATTACh BLOwER TO jOB BOx

CAuTION: The machine should be removed with two people or lifted
mechanically by the lift rings located on the top of the machine (Figure 4).

ImPORTANT: The Deluxe Blower should not be parked on a slope in excess of 13°.
It should not be parked on a side hill of more that 15°.

Remove the ball detent pin from the bottom of the blower. Attach the Deluxe Blower
to the job box by aligning the guide tracks on the bottom of the blower with the
channel on the top of the box. Holes in the box channel need to align with holes on
the blower guide track. Once aligned, replace ball detent pin so it locks the blower in
place (Figure 5).

Lift

Rings

Figure 4. Lift out Blower with

Lift Rings

Figure 5. Replace Ball Detent Pin

5.

Advertising