Schwank STW-JZ1 User Manual

Page 15

Advertising
background image

15

STW-JZ / IW I&O Manual

IM101229

RL: 12A- BA

RD: DEC 2010


#6

After installation of the elbow assembly,
fasten the corners of the reflector cover
with the 2 screws provided.

For 90° installation finish with step # 7

For 180° installation skip # 7 and proceed
to step # 8


#7

Suspending the elbow kit in horizontal
position prepared for tube installation in
horizontal mode.


#8

180° ELBOW KIT ASSEMBLY

Add the second coupler to the 90° elbow
kit to form 180° elbow kit

Slacken the bolts and slide the coupler
over the elbow at the swaged end.


#9

Add the third plate hanger to the elbow kit
– pay attention to the mouting position of
the plate. Always with the cavity facing
toward the ‘burner end’ of the system


#10

Place the second reflector over the plate
hangers. Secure the reflector with 8
screws to the plate hanger.

Advertising