Warning – Schwank STW-JZ1 User Manual

Page 9

Advertising
background image

9

STW-JZ / IW I&O Manual

IM101229

RL: 12A- BA

RD: DEC 2010

2.

INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS

Low intensity radiant tube heaters are suitable for use in aircraft hangars when installed in ac-
cordance with the latest edition of the Standard for Aircraft Hangars, ANSI/NFPA No 409 in the
USA, or the Canadian Natural Gas and Propane Installation Code, B149.1.

A. A minimum clearance of 10 ft (3 m) above either the highest fuel storage compartment or

the highest engine enclosure of the highest aircraft which may occupy the hangar. The
clearance to the bottom of the heater shall be measured from the upper surface of either
the fuel storage compartment or the engine enclosure, whichever is higher from the floor.

B. A minimum clearance of 8 ft (2.4 m) must be maintained from the bottom of the heater to

the floor in other sections of the aircraft hangar, such as offices and shops, which communi-
cate with areas for servicing or storage. Refer to Table 1 for proper mounting clearances to
combustibles.

C. Heaters must be located so as to be protected from damage by aircraft and other objects,

such as cranes and movable scaffolding.

D. Heaters must be located so as to be accessible for servicing and adjustment.

1. LABOR REQUIRMENTS

Two persons are required to safely install this equipment. Wear gloves and other required
safety protection.

3. INSTALLATION IN COMMERCIAL GARAGES AND PARKING STRUCTURES

Low Intensity Heaters are suitable for use in commercial garages when installed in accordance

with the latest edition of the Standard for Parking Structures, ANSI/NFPA 88A, or the Standard

for Repair Garages, ANSI/NFPA No. 88B, or the Canadian Natural Gas and Propane Installa-

tion Code, B149.1.

An overhead heater shall be located high enough to maintain the

minimum distance to combustibles, as shown on the heater rating

plate, from the heater to any vehicles parked below the heater.

Overhead heaters shall be installed at least 8 ft (2.4 m) above the floor.

4.

INSTALLATIONS OTHER THAN SPACE HEATING

Use for process or other applications that are not space heating will void the C.S.A. certification

and product warranty. Process application requires field inspection and/or certification by local

authorities having jurisdiction.

WARNING

Advertising