Fasten second tube to first tube – Schwank STW-JZ1 User Manual

Page 24

Advertising
background image

24

STW-JZ / IW I&O Manual

IM101229

RL: 12A- BA

RD: DEC 2010

TOOLS REQUIRED

¼” Drill Bit (supplied)  Electric Drill

SPECIAL COUPLER INSTALLATION

1. Slide the loosened tube coupler on to the first tube, past the swage

2. The second tube is supplied with a ¼” hole in the tube at the female end.

3. Slide second tube over swaged end of first tube so that ¼” hole is located 90° up from the

bottom surface of tube

4. Through the existing ¼” hole , drill a ¼” hole through the wall of the first tube

5. Insert ¼” rivet into the hole

6. Slide coupler into position – half onto each tube – covering the rivet head

7. Tighten coupler bolts to 40 ft-lb

8. Install reflectors

9.1

SPECIAL COUPLING: 175,000 & 200,000 Btuh

NOTE: The joint between the first and second tubes of the 175,000 & 200,000 heaters ex-
perience strong forces of expansion. Follow instructions below for Special Coupling of the
first to second tube.

FIGURE 13 SPECIAL COUPLING:

175,000 & 200,000 Btuh

-

Fasten Second Tube to First Tube

-

Steps 1 to 4

Step 5

Step 6

1/4” Rivet