Installation, Unit assembly prior to installation, Nailing strips – Regency Horizon HZ40E Medium Gas Fireplace User Manual

Page 12: Installation access panel, Front face nailing strip installation

Advertising
background image

12

Regency Horizon™ HZ40E-2 Gas Fireplace

INSTALLATION

UNIT ASSEMBLY

PRIOR TO

INSTALLATION

The nailing Strips must be correctly positioned and attached before unit is
slid into position.

NAILING STRIPS

The nailing strips come attached to the unit. There is 1 plate on each side, 1
on the top. There also two on the bottom.
The top and side nailing strips are secured to the framing. The bottom
nailing strips are

IMPORTANT NOTE

Framing depth measurement is noted with the nailing strips
set as far forward on the fi rebox as possible. The nailing
strips can be adjusted back up to 1-1/2” to allow for varying
thicknesses in non-combustible material & wall fi nishes.

Nailing Strips

INSTALLATION ACCESS PANEL

The unit is equipped with a removable access panel for pre-fi nish installation
of optional components - this panel is located on the lower front face.

1) Remove lower front face nailing strips (2 screws per nailing strip).

2) Remove 8 screws to remove access panel.

3) Easier access to gas connection with panel removed.

4) Install any optional components with access panel removed.

5) Reinstall access panel with 8 screws and lower front face nailing strips

(2 screws per strip) - prior to installing any facing material

Note: Access panel is no longer usable once facing material installed.

FRONT FACE NAILING STRIP

INSTALLATION

Required when the combined facing/fi nishing material is 1/2".
If using material which is thicker than 1/2", the nailing strips are not
required and should be removed and discarded.

1) The 5 front nailing strips are only used if the facing/fi nishing material

is a combined 1/2" in thickness. This enables the facing and fi nishing
materials to be securely fastened to a solid surface.

2) Follow instructions on non-combustible facing installation for pre-

drilling holes prior to attaching the noncombustible material supplied
with this unit.

3) The side/top nailing strips which are attached to this unit will also need

to be adjusted. See Framing and fi nishing in this manual.

Installation Access Panel

Lower front nailing strips

Advertising