Installation, Unit installation with horizontal termination – Regency Horizon HZ40E Medium Gas Fireplace User Manual

Page 35

Advertising
background image

Regency Horizon™ HZ40E-2 Gas Fireplace

35

INSTALLATION

1) Locate the unit in the framing, rough in the gas

(preferably on the right side of the unit). Locate
the centerline of the termination and mark wall
accordingly. Cut an square hole in the wall - see
chart (inside dimension).

Note: If installing termination on a siding cov-

ered wall, a vinyl siding standoff or vinyl
furring strips must be used to ensure that
the termination is not recessed into the
siding.

2) Level

the

fi replace and fasten it to the framing

using nails or screws through the nailing strips.

3) Assemble the vent assembly by applying Mill

Pac to the inner fl ue collar of the termination and
slipping the inner fl ex liner over it at least 1-3/8"
(35mm). Fasten with the 3 screws (drilling pilot
holes will make this easier). Apply Mill Pac or
high temperature silicone to the outer fl ex pipe
and slip it over the outer fl ue collar of the vent
terminal at least 1-3/8"(35mm) and fasten with
the 3 screws.

11”

(294mm)

11”

(294mm)

ASTROCAP

DIMENSIONS (946-523/P)

Minimum Vent Clearances

to Combustibles

UNIT INSTALLATION

WITH HORIZONTAL

TERMINATION

4" X 6-5/8"

VENTING

(Flex Vent Systems)

NOTE: Horizontal sections must be supported

at intervals not exceeding 3 feet (0.9
meter). (Flame picture and performance
will be affected by sags in the liner).

4) Separate the 2 halves of the wall thimble and

securely fasten the one with the tabs to the
outside wall making sure that the tabs are on
top and bottom. Fasten the other thimble half
to the inside wall. The thimble halves slip inside
each other and can be adjusted for 2 x 4 or 2
x 6 walls.

5) Slip the assembled liner and termination

assembly through the thimble making sure the
termination cap faces up (there are markings
on the cap indicating which way is up). This
will position the termination cap with proper
down slope for draining water. Fasten the cap
to the outer wall with the 4 supplied screws.

6) Pull the centre inner and outer fl ex liner out

enough to slip over the fl ue collars of the
fi replace. (You may wish to cut the liner shorter
to make it more workable.) Do not bend liner
more than 90

o

. The liners must slip over the

collars a minimum of 1-3/8".

7) Apply Mill Pac over the fi replace inner fl ue

collar and slip the inner fl ex liner down over it
and attach with 3 supplied screws.

8) Do the same with the outer fl ue collar and outer

fl ex liner.

9) Apply a bead of silicone between the thimble

and termination and around the outer edge of
the terminal at the wall in order to keep the
water out.

IMPORTANT: Do not locate termination hood
where excessive snow or ice buildup may
occur. Be sure to check vent termination
area after snow falls, and clear to prevent
accidental blockage of venting system. When
using snow blowers, make sure snow is not
directed towards vent termination area.

* Clearances noted below must be maintained;
except when passing through a wall, ceiling or at the
termination where the use of a fi restop or wall thimble
reduces clearance to 1" (25mm).

Recommended Framed Opening

Size

Vent Size

Framing Size

4" x 6 - 5/8"

10" x 10"

Below are the recommended framing dimensions
(inside measurements) for the 4" x 6-5/8" rigid
vent terminations - for use with a fi restop or wall
thimble.

Horizontal Top*

3" (76mm)*

Horizontal Side

2 " (51mm)

Horizontal Bottom

2" (51mm)

Vertical Vent

2" (51mm)

Termination

Cap

Wall Thimble 2 pieces

(10" (254mm)

Outer Diameter)

2” x 4” or 2” x 6”

6-7/8" (173mm)
dia. air intake

4" (102mm) dia. flue pipe

with spring spacer

Screws

(3 per

connection)

Screws

(4 per

connection)

CL

CL

36-1/4”

(921mm)

Min.

of hole

Using Fle

x System

Advertising