Summary – Rockwell Automation 2085 Micro800 Discrete and Analog Expansion I/O Modules User Manual

Page 36

Advertising
background image

28

Rockwell Automation Publication 2080-UM003A-EN-E - March 2013

Chapter 4 Install Your Micro800 Expansion I/O

Summary

This chapter provided a step-by-step description of the process for assembling,
mounting, and installing the Micro850 controller with the expansion I/O
modules.

Slide up both locks located at either side
of each expansion I/O and then attach the
I/O to the connecting latch hooks and bus
connector on the controller or the last
expansion I/O. After latching, slide down
both locks to securely fasten the I/O to
the controller.

45928

2085-ECR serves as an end cap and terminates the end of the serial communication bus.
The end cap is connected to the last I/O module in the system.

Advertising