Metrohm NIRS XDS Interactance OptiProbe Analyzer User Manual

Page 25

Advertising
background image

▪▪▪▪▪▪▪

23

9.

Lift the release handle on the

monochromator and engage the module
“catches” to the locking togs on the
monochromator. (Module not shown to
allow a good view of handle.)

Push monochromator and module together
firmly (with handle up) then lower the
release handle.

10.

When the catches are fully engaged to the

locking togs, push the release handle down
all the way.

This automatically engages the electrical
connector and fiber optic interface, and
maintains proper alignment of the module
to the instrument.

Carefully wind the fiber bundle clockwise
around the “saddle.” The 2-meter probe
(shown) takes one wrap. The 3-meter
probe takes 2 wraps.

The final assembly is as shown.

11.

Plug the AC power cord into a grounded AC outlet. A surge protector or Uninterruptible

Power Supply (UPS) is recommended for best operation.

12.

For “Direct Connection” the gray cable

from the instrument plugs directly to the
computer network jack. (Use the UTP-
crossover cable supplied with the
instrument.)

If using a network, use a non-crossover
type cable as listed in section 3.0. Plug the
RJ-45 network connector into a functional
network port.

If this requires approval from a network
administrator, it should be properly
approved for hookup.

Advertising