Klimaire KSIL024-H219 Service Manual User Manual

Page 30

Advertising
background image

28

6).When the electronic scale displays the proper weight (refer to the gauge and the pressure of the

low side), disconnect the charge hose from the 3-way valve’s service port immediately and turn off the

air conditioner before disconnecting the hose.

7). Mount the valve stem caps and the service port

Use torque wrench to tighten the service port cap to a torque of 18N.m.

Be sure to check for gas leakage.

6.6 Re-installation while the indoor unit need to be repaired

1. Collecting the refrigerant into the outdoor unit

Procedure

1). Confirm that both the 2-way and 3-way valves are set to the opened position

Remove the valve stem caps and confirm that the valve stems are in the opened position.

Be sure to use a hexagonal wrench to operate the valve stems.

2). Connect the charge hose with the push pin of handle lo to the 3-way valves gas service port.

3). Air purging of the charge hose.

Open the handle Lo valve of the manifold valve

slightly to purge air from the charge hose for 5

seconds and then close it quickly.

4). Set the 2-way valve to the close position.

Advertising
This manual is related to the following products: