Outback Power Systems MATE2 User Manual

Page 79

Advertising
background image



ADV/MATE/AGS-----------------------

choose category

QUIET VOLT

SETUP TIME START PG2

ADV/MATE/AGS/PG2----------------

choose category

LOAD MUST

PG1 START RUN PG3

ADV/MATE/AGS/LS------------------

load start 0 kw

DOWN AGS INC DEC

ADV/MATE/AGS/LS------------------

load start 1 min

delay

DOWN UP INC DEC

Go to the ADV/MATE/AGS screen and press the

<P2> soft key.

At the ADV/MATE/AGS/PG2 screen, press the

<LOAD START> soft key.

In the load start kw screen, an AGS start

command will be issued when the total AC load

of all the FXs connected to the MATE exceeds

this setting for the load start delay (next screen)

time. A zero value disables any load start function.

<INC> and <DEC> adjusts this setting between

1 – 50kW. After the value has been set, press the

<DOWN> soft key to get to the load start delay

screen.

This setting is the delay time that the total system

AC load must remain above the load start kw

setting (see previous screen), before the generator

is started. It is adjustable from 1 to 240 minutes

using the <INC> and <DEC> soft keys. After

making any adjustments to the delay time, press

the <DOWN> soft key to go to the load stop kw

screen.

Load Start KW

Load Start Delay

To open the Load Start screen: