Generator exercise – Outback Power Systems MATE2 User Manual

Page 88

Advertising
background image



This takes you to the ADV/MATE/AGS/EX (exercise) screen for running a lightly used

generator at least one day a month to assure it’s in good working order (see next section).

Why you might want it: Exercising a generator prolongs its life and dependability.

Regularly running a generator keeps engine components lubricated, expels excess moisture,

charges the starting battery, and helps prevent carbon build-up. Consult your generator owner’s

manual to find the manufacturer’s recommendations for appropriate length and frequency of

exercise periods and what load to run during the exercise periods.

An Exercise time can be set by choosing a day of the week (Sun – Sat), a start time of day

(12AM – 11:59PM), and an exercise period (1 – 240 minutes). The generator will run once a

month at this chosen time during the first occurrence of the chosen day.

Sample Generator Exercise Schedule
Day: Saturday

Time: 10:00 a.m.

Exercise Period: 15 minutes

A fifteen minute exercise period with loads running

is a good starting point for most generators.

Press the <PG4> soft key

Press the <EXERCISE> soft key.

ADV/MATE/AGS/PG3---------------

choose category

%SOC

PG2 START TIMERS PG4

ADV/MATE/AGS/PG5--------------

choose category

PG2 EXERCISE ADV

Generator Exercise

Advertising
This manual is related to the following products: