4

IQ plus 2100 Installation Manual

Figure 2-2. IQ plus 210 CPU and Power Supply Board

2.2.2

Load Cells

Wire the load cell cable to connector J5 as sho wn in

Table 2-1. If using 6-wire load cell cable (with sense

wires), remove jumpers JP1 and JP2 (see Figure 2-2).

For 4-wire installation, leave jumpers JP1 and JP2 on.

NOTE: All models come with ten feet of color-coded
load cell cable. Do not cut this cable! The load cell is
temperature-compensated for an exact cable length of
ten feet. Cutting the load cell cable voids the load cell
warranty.

When connections are complete, use tw o cable ties to

secure the load cell cable to the inside of the enclosure.

2.2.3

Setting the Load Cell Compensation Jumper

The load cell compensation jumper (abo ve the

ZERO

button location on the CPU board; see Figure 2-2) must

be set for the type of load cell connected to the

indicator:

• For load cells with balanced bridges, set the

jumper in the OFF position. Balanced load cells

include the RL1040, RL1250, RL1260, RL1380,

and RL1385.

• For load cells with unbalanced bridges, follow the

procedure below to determine the correct jumper

position. Examples of unbalanced cells include

the RL1042 and RL1010.

To determine the correct jumper position for

unbalanced cells, do the following;

1. Disconnect load cell from indicator.
2. Use an ohmmeter to measure +EXC to +SIG and

+EXC to –SIG. Measured values between the

excitation line and each of the signal lines should

be within 2–3Ω.

3. Next, measure –EXC to +SIG and –EXC to

–SIG. Measured v alues between the e xcitation

line and each of the signal lines should be within

2–3Ω.

4. If the +EXC measurements (step 2) are ≥ 5%

larger than the –EXC measurements (step 3), set

the compensation jumper in the ON position. If

the +EXC measurements are < 5% greater (or are

less) than the –EXC measurements, set the

jumper in the OFF position.

F1

F2

Blue wire

J8

Brown wire

J1

To setup switch

J7

1

2

3

SERIAL COMM

TxD

GND

RxD

VR3

LOAD CELL CONNECTOR

1

2

3

4

5

6

–SIG

+SENSE

–SENSE

+EXC

–EXC

+SIG

J5

J2

J3

1

1

GND

DIGIN 2

DIGIN 1

J6

J4

GND

BR1

+

VR1

VR2

JP1

JP2

RESET

ANALOG

+5V

TEST

DIGITAL

+5V

TEST

TP1

TP2

A / D C o n v e r t e r

Microprocessor

Tr a n s f o r m e r

U N I T S

B u t t o n

Z E R O

B u t t o n

P o w e r

I n p u t

ON

OFF

JP1

Load cell
compensation
jumper

GND

J5 Pin

Function

Load Cell Wire Color

RL1040
RL1042

RL1380

1

+SIG

Red

White

2

–SIG

White

Red

3

+SENSE

Blue

4

–SENSE

Brown

5

+EXC

Green

Green

6

–EXC

Black

Black

NOTES:

1.Use grounding procedure described in Section 2.2.1

on page 3 to attach shield wire to backplate.

2.For 6-wire connections, remove jumpers JP1 and JP2.

Table 2-1. J5 Pin Assignments

Advertising