3 swap bank after download and reset, Swap bank after download and reset – CANOGA PERKINS 9145E Standard NID Software Version 1.0 User Manual

Page 86

Advertising
background image

9145E NID Software User’s Manual

Software Upgrade

Swap Bank After Download and Reset

76

NOTE: The software on the new inactive flash memory bank will remain in memory

and not be deleted.

Figure 8-1 Software Upgrade Screen

8.3 Swap Bank After Download and Reset

Option 3 allows you to select automatically swapping banks on reset after a successful download. Select
Yes for automatically swap banks. Select No to have downloaded software remain in the inactive bank.
This option does not generate a reset.

Type 3 and press Enter. Press the Space Bar to cycle between Yes and No.

NOTE: Users will be disconnected when the 9145E is reset.

The flag must be set before the download of the new software while Swap Bank after Download and reset
is set. After downloading software, the message line will read Loads xx.xx on Next Reset.

Canoga Perkins Corp. Ethernet Network Interface Device 23-APR-2009
Model 9145E-404-8-0 V01.00 F506 16:43:56
------------------------------------SOFTWARE UPGRADE---------------------------

Time Since Last Restart 3 days 01:32:35

Version File Name File Size

Active Firmware 01.00 9145E-A20-01-00.ZIP 1852063
Inactive Firmware 01.00 9145E-A20-01-00.ZIP 1844954
Bootcode 02.30 9145E-B00-02-22.BIN 337966

1) Software Reset Reset
2) Swap Bank & Reset Swap
3) Swap Bank after
download and reset Yes

4) Get New File with TFTP

Select [1-4]:

------------------------------------Messages-----------------------------------

Advertising