Caution, Initial set-up, Installation – Steffes 6140 User Manual

Page 12: System dimensions figure 3

Advertising
background image

Installation

n

3.03

Comfort Plus Commercial

Installation

INITIAL SET-UP

Step 1 Remove the Information Package from the

outside of the shipping box and unpackage

the Comfort Plus Commercial heating

system.

Step 2 Remove the heating elements from inside

the base of the system.

Step 3 Move the system into its installation loca-

tion. It is capable of fitting through a 30"

doorway (minimum) without disassembling.

If necessary, it can be disassembled for

ease in moving. To disassemble the system,

refer to the disassembly instructions (Page

A.02) for more information.

Step 4 Once in place, adjust the leveling legs on the bottom of the system as necessary to prevent rocking. If

not placed properly the system may bend or twist during the brick loading process, making element and

brick core temperature sensor installation difficult.

Step 5 Remove the painted front panel of the brick storage cabinet by removing the sheet metal screws along

the top, bottom, and sides of the panel. Detach by pulling the bottom of the panel forward and down.

Step 6 Locate the element wiring harnesses and the brick core temperature sensors behind the front painted

panel. Disconnect them from their shipping location. Carefully position them to avoid damage during the

brick loading and wiring processes.

The 6140 has three brick core temperature sensors.

CAUTION

Risk of improper operation or equipment dam-

age. Read and follow installation instructions

carefully.
w DO NOT install the Comfort Plus Commercial

system on its shipping pallet.

w DO NOT extend the leveling legs more than

one inch.

w DO use and follow generally accepted safety

practices when handling insulation material.

w DO have equipment installed by a qualified

technician in compliance with all applicable

codes and regulations.

SYSTEM DIMENSIONS

FIGURE 3

29

3

16

"

Front View

44

11

16

"

P
M

M

M

A

49

7

16

" (

1
2

HP Blower)

53

15
16

" (1 HP Blower)

STEFFES

25

1

16

"

24

1
4

"

22

5
8

"

8

3
8

"

1
4

")

18" (

1
2

HP Blower)

22

1
2

" (1 HP Blower)

6140

68

5
8

"

Unit Duct

Opening

225 16"

10

1

2

"

Side View

NOTE:

Factory built

Return Air Plenum

is 52 5/16” high.

77

5
8

" (

1
2

HP Blower)

82

1
8

" (1 HP Blower)

29

3

16

"

Top View

28

3

16

"

26

1

16

"

Return Air Plenum

(Order Item

#1301550)

22

3

16

"

14"(±

1
4

")

22

5
8

"

13

3
4

" (±

1
4

")

Factory Supply

Air Plenum

24

3
4

" (1 HP Blower)

20

1
4

" (

1
2

HP Blower)

Advertising
This manual is related to the following products: