Warning, Heating element and air channel installation – Steffes 6140 User Manual

Page 14

Advertising
background image

Step 1 After all brick are loaded, insert the heating elements between the brick layers, sliding them in until the

element ends embed into the side cutouts of the brick cavity.

The elements MUST be installed so their threaded screw tabs on the wire connection terminals point

forward and down. If they are installed with the screw tabs pointing upward, element-to-wiring harness

connections will be difficult. Elements must be slid into the brick

core properly to ensure correct clearance between the terminal

connections and any surfaces within the system. Refer to the

required element connection clearance information in Figure 6.

Step 2 Install the front air channel with the air deflectors (arrow shaped

pieces) facing inward and with the narrow ends of the deflectors

pointing up. Place bottom portion in first (Figure 5).

Step 3 Lower the insulation blankets back into position, one at a time.

Carefully tuck the sides of the insulation into the edges, corners, and

around the exposed portions of the heating elements to ensure

maximum efficiency.

Step 4 Reinstall the galvanized front panel and secure it to the system using

the screws that were originally removed. Slide the bottom of this

panel inside the lower lip of the brick cavity. The top rests on the

outside of the cavity.

Step 5 Remove the electrical panel cover and locate the element screw kit.
Step 6 Carefully route wiring harnesses and connect them to the heating elements, using screws provided in the

hardware package. Make connections with screw heads up and threads pointing down. Element screws

should be tightened to 20 inch lbs. Refer to Element Installation (Figure 6) for proper positioning.

Step 7 The brick core temperature sensor must be installed prior to putting the painted front panel in place.

HEATING ELEMENT AND AIR CHANNEL INSTALLATION

Installation

n

3.05

Comfort Plus Commercial

Installation

  



 



 



 

AIR CHANNEL PLACEMENT

FIGURE 5

3
4

"

Required Clearance Between

Element Termination and Metal

Panels is 1/2" (3/4" Nominal)

Element Connection

ELEMENT INSTALLATION

FIGURE 6

TOP VIEW

HAZARDOUS VOLTAGE: Risk

of electric shock. Can cause

injury or death.

w DO NOT remove the electri-

cal panel cover while

system is energized.

w Position elements properly

to avoid short circuiting

them against metal sur-

faces.

w Protect element lead wires

from front panel screws

and any field installed

screws to avoid short

circuit.

WARNING