Temperature control, Brick core charge control, Charge control override – Steffes 7140 User Manual

Page 7: Maintenance and cleaning

Advertising
background image

Comfort Plus Commercial Hydronic

Operation

n

1.03

Operation

TEMPERATURE CONTROL

Temperature set point is adjusted at the wall thermostat(s) or the main system control. If temperature in the area

drops below the desired set point, a heat call is initiated and the primary loop pump is energized. The variable

speed core blower automatically adjusts speed in relation to brick core temperature to achieve the desired outlet

water temperatures. The heated water is then pumped to the area (zone) from which the call originated.

The versatility of this system allows it to fit many applications. The Comfort Plus Commercial Hydronic is de-

signed for use as either the sole heating source (“stand alone” furnace) or as a supplement to ducted heating

systems such as heat pumps.

The Steffes Air Handler can be interfaced with a standard heat pump system and will provide comfort modula-

tion. The system will monitor the outlet air temperature and modulate in heat from the Comfort Plus Commercial

Hydronic as needed to maintain the desired output air temperature. If one of the zones is a water coil used to

temper duct temperatures, an optional duct sensor (Order Item# 1041536) can be used.

BRICK CORE CHARGE CONTROL

The amount of heat stored in the brick core varies in relation to outdoor temperature, current building load, utility

peak conditions, and/or the heating requirements. The outdoor sensor, if installed, monitors outdoor temperature

and provides this information to the system. As the outdoor temperature decreases, heating requirements increase

and the system stores more heat accordingly.

The amount of heat stored in the system can also be regulated by a signal from a BACnet

control, energy management system, or serial communication input.

CHARGE CONTROL OVERRIDE

If desired, the Comfort Plus Commercial Hydronic system can be programmed to allow a charge control override.

This override allows the user to force the system to target a full core charge level and can be initiated or cancelled

at any time. If an override is initiated, the system targets a full core charge level during the next off-peak period. It

continues to charge during off-peak hours until it achieves full (maximum) core charge or until the override is

cancelled. Once full charge is achieved or the override is cancelled, the system charges according to the standard

configuration.

MAINTENANCE AND CLEANING

Any air filter(s) in the system should be replaced on a regular basis to ensure proper operation and to maintain

overall efficiencies. No additional routine maintenance is required.

If utilizing a heat pump or air conditioning system with the Comfort Plus Commercial Hydronic system, the indoor

coil should be cleaned periodically as dirt accumulation may reduce system efficiency. It is important to follow the

manufacturer’s maintenance and cleaning recommendations for these devices.

Advertising
This manual is related to the following products: