Hangar 9 35% Extra 300 ARF (3 Boxes) User Manual

Page 21

Advertising
background image

21

35% Extra 300 ARF Assembly Manual

9. Mark where the throttle linkage touches the engine

box.

10. Using a rotary tool and sanding drum, remove some

of the edge of the engine box so the throttle linkage has a

straight shot to the engine throttle arm with no binding.

11. Complete the throttle linkage installation by powering

servo and making adjustments through the radio.

Advertising