Hangar 9 35% Extra 300 ARF (3 Boxes) User Manual

Page 27

Advertising
background image

27

35% Extra 300 ARF Assembly Manual

11. Recommended header length for MTW RE2 tuned

pipe and DA120 is 11 1/2 inches . Assemble the pipe/header

using a vice-grip. Open the clamps and slide them over the

header.

12. Coupler fit on the header is tight. Use the working

bench to lay one side of the coupler on and exert pressure

from the other side by hand.

13. Push the other side of coupler into the RE2 pipe and

leave 1/8–1/4 inch gap between header and pipe.

14. Once satisfied with the gap, pull the clamps on and

over the coupler and pipe. Then slide the other clamp on

the pipe and header, such that is it forward the bump on the

header.

15. Once everything is assembled, heat the couplers

where clamps are using a heat gun at high setting. Do this

for a few minutes and allow some time for cooling. Repeat

this one more time. This creates a good grip and reduces

chance of pipe/header slipping out in flight. It is also

recommended to do this before the first flight. Let engine

idle for 3 to 4 minutes to warm up the couplers, gradually

increasing the throttle to half to get the engine hot and then

allow a cool- down period before the first flight. This should

not need repeating and when done right, header/pipe will not

slip out.

16. Slide the pipes into the tunnel. Use lubricants over

the pipes or the silicone mount for ease of installation.

17. Apply threadlock to header bolts and use DA gasket

or high-temperature RTV and bolt the headers to the engine.

Advertising