HI HLPS SERIES LOAD POINT ASSEMBLY

Page 4

if you are shipping the vessel fully

assembled on the load points.

Step 4.

Save the two shortest machine screws (the
hex bolts that fasten the shipping brackets
to the base plate). You will use them to
install the ground strap. (See Fig. 1-4)

Step 5.

Place one of the ground strap connectors
over the threaded hole in the base plate.
These are the ones that fastened the ship-
ping bracket to the base. (See Fig. 5)

FIG. 5: GROUND STRAP INSTALLED

Step 6.

Install a hex bolt. Tighten with a box-end
wrench.

Step 7.

Place the other ground strap connector
over the threaded hole in the top plate.

Step 8.

Install the other hex bolt. Tighten with a
box-end wrench.

Step 9.

Fig. 5 shows the ground strap installed on
the left side when facing the front of the
load point assembly. However, you can
install the strap on either side if necessary.

NOTE:

Do not connect the ground strap to the base plate on
the right side and to the top plate on the left side or
vice versa. Crossing over will interfere with the load
cell performance.