Hardy HI LPRE05 Shear Beams User Manual

Page 23

Advertising
background image

OPERATION AND INSTALLATION MANUAL

Page 17

FIG. 19: LOAD POINT ASSEMBLIES ORIEN-

TATION

This illustration uses the fixed load point
assembly, but you can do the same with
any of the load point assembly types.

Step 13.

Use a bubble level to level the load point
assembly from side to side and corner to
corner. Use a box end wrench to adjust
each of the jacking nuts until each load
point assembly in the system is level.

Step 14.

Install the base plate nuts finger tight. You
may need to adjust the jacking nuts later as
you install the rest of the load point assem-
blies for the weighing system.

Step 15.

If you replaced a loading pin or load cell,
make sure you grease the sliding and
fixed pins and the fixed pin housings in the
top plate and the load cell. Clean the stain-
less plate on the under side of the top plate
and verify that the stainless plate is free of
scratches or other damage. Replace the
Stainless plate if scratched or damaged.

Step 16.

Install the rest of the load point assemblies
according to the Positioning Principles.
(See Principles, pgs. 6 & 7)

NOTE:

Load variations and external forces can cause sup-
port surface level variations.

Advertising
This manual is related to the following products: