HI HLPS SERIES LOAD POINT ASSEMBLY

Page 16

Step 8.

When you place the anchor bolts into the
concrete foundation, slip the templates
over the anchor bolts so that the bolt center
distances will be the same as the base plate
thru holes of the load cell. You can leave
the templates there until after the concrete
drys or remove them when you think the
concrete has set to the point where the
anchor bolts won’t move.

Step 9.

Allow room to install the jacking nuts and
washers. You are going to make the level
adjustments with the jacking nuts. (See
Fig. 18)

FIG. 18: INSTALLING THE FOUR ANCHOR

BOLTS FOR THE BASE PLATE

Step 10.

Install the jacking nuts onto the anchor
bolts so there is about 1/2 inch between the
concrete foundation and the jacking nuts.
Don’t worry about level at this point, you
will level everything after the Load Point
Assembly/base plate is installed.

Step 11.

Install four flat washers on each anchor
bolt above the jacking nuts. (See Fig. 17)

Step 12.

Slide the load point assembly/base plate
onto the anchor bolts. You can install the
load point assemblies in one of four orien-
tations. (See Fig. 19)