Hardy HI LPRE05 Shear Beams User Manual

Page 29

Advertising
background image

OPERATION AND INSTALLATION MANUAL

Page 23

Step 7.

Screw the two load cell bolts into the base
plate until they are finger tight only.

Step 8.

The height (B) dimension is the minimum
required service area above the load cell
baseplate to remove the load cell bolts.
(See Fig. 24 & Table 3)

FIG. 25: B DIMENSION

Step 9.

Use a torque wrench and tighten the bolt
farthest from the cable end first. Then
tighten the bolt nearest the cable end.

Step 10.

Again refer to the B dimensions. Use the
following torque values:

MODEL #

HEIGHT B

HI HLPS 1125, 2.25K,4.5K

2.91

(74.0)

HI HLPS 11.25K

4.02

(102)

HI HLPS 22.5K

5.83

(148)

TABLE 3: B DIMENSIONS

Advertising
This manual is related to the following products: