CHAPTER 6 SCHEDULED MAINTENANCE

6.1 INTRODUCTION

This chapter lists the preventive maintenance procedures recommended for the heat exchanger and
Electronic Control System (ECS). These recommendations include procedures to be performed each
week (6.2), month (6.3), quarter (6.4), six-month interval (6.5) and year (6.6).

The recommended preventive maintenance schedule is summarized in Table 6-1 at the end of this
chapter.

6.2 WEEKLY MAINTENANCE

Tube Leaks

Check the leak detection tube once each week for evidence of leaks in the heat exchanger tubes.
MAKE CERTAIN THAT THE DETECTION TUBE NEVER GETS PLUGGED. If any fluid is escaping
from the detection tube, shut down the heat exchanger as outlined in Section 5.4 and see Section 9.2
to investigate the leak.

6.3 MONTHLY MAINTENANCE

Steam Strainer

After the first month of operation, clean the strainer in the Steam Input line in accordance with the
instructions furnished with the strainer.

CXT-E Control Valve

Check the CXT-E Control Valve (“Valve”) for leaks, as follows:

1. Referring to Figure 6-1, check the packing nut and Valve top for evidence of leakage.

INDICATOR
PLATE

VALVE
TOP

PACKING

NUT

P/O LINKAGE

ASSEMBLY

LOWER

SHAFT

Figure 6-1. Valve Shaft Seals

2. If there is leakage between the packing nut and Valve top, tighten the packing nut until the leakage

stops. DO NOT FORCE the packing nut.

CAUTION

Take care not to over-tighten the packing nut to avoid trapping the valve
stem and slowing or stopping Valve motion.

3. If tightening the packing nut does not stop the leak, the packing nut and packing assembly must be

replaced in accordance with the procedures specified in Sections 8.2.2 and 8.2.3.