A.1 temperature controller procedures, A.1.1.1 parts needed, He- 111 − appendix a – AERCO SWDW68 U-Tube Double-Wall Heaters w/ECS User Manual

Page 88

Advertising
background image

HE-

111 − APPENDIX A

Rev B Mar 2013

A-2

A.1 TEMPERATURE CONTROLLER PROCEDURES

A.1.1 Adding a Communication Board to the Temperature Controller

A.1.1.1 Parts Needed

1. Control Box Assembly ECS, P/N: 69012-[ ]

2. Temperature Indicating Controller, P/N: 64008

3. Communications Board, P/N: 64009-[ ]

A.1.1.2 Procedure for Adding the Communication Board

1. Turn off power to Control Box Assembly ECS (P/N 69012-[ ])

2. Slide out Temperature Indicating Controller (P/N: 64008) from Control Box Assembly by gently pushing

the indicated latching ears to the side (See Figure 1).

Figure 1

3. Slide Communications Board (P/N 64009-[ ]) into Temperature Indicating Controller slot (COMMS 1).

See Figure 2. Make sure to push Communications Board all the way in to ensure it is firmly seated in
its slot.

Figure 2

COMMUNICATIONS
BOARD

LATCHING
EARS (2)

Advertising