Before mounting the components in the rack – Toa FS-970 SERIES User Manual

Page 15

Advertising
background image

15

7. BEFORE MOUNTING THE COMPONENTS IN THE RACK

7.1. Integrated Control Panel EP-0510

• Chime Switch Installation

To activate the external chime device or the CK-025 Chime Unit built in the PP-025B Pre-amplifier, install the
chime switch (supplied with the EP-0510) as shown below. You may skip the following installation procedures
if the chime does not need to be activated from the EP-0510.

Supplied label

1. Push to break the chime switch hole on the

Operation Panel.

2. Remove two screws on the right of the

Operation Panel and open the panel.

3. Mount the chime switch to the inside of the

front panel using the supplied screws (3x6).

4. Connect the chime switch connector to CN8

on the control circuit board.

5. Attach the supplied label to the Operation

Panel.

Chime switch

Screw (3x6)

Mount from the back of the panel.

CN8

Control circuit board

Advertising