3 commissioning, 1 scope of delivery, 2 power supply – YSI MultiLab 4010-2 User Manual

Page 12: 3 initial commissioning, Commissioning, Scope of delivery, Power supply, Initial commissioning, 3commissioning

Advertising
background image

Commissioning

MultiLab 4010-2

12

ba76142e03

08/2013

3

Commissioning

3.1

Scope of delivery

MeterMultiLab 4010-2

USB cable (A plug on mini B plug)

Power pack

Stand with stand base

Short instructions

Detailed operating manual

CD-ROM

3.2

Power supply

The MultiLab 4010-2 is supplied with power in the following ways:

Mains operation with the supplied power pack

Operation of the system clock with a buffer battery if there is no mains power
supply (see section 13.1.2 E

XCHANGING

THE

BATTERY

, page 111).

3.3

Initial commissioning

Perform the following activities:

Connect the power pack
(see section 3.3.1 C

ONNECTING

THE

POWER

PACK

, page 13)

Switch on the meter
(see section 4.2 S

WITCHING

ON

THE

METER

, page 19)

Set the date and time
(see section 4.5.5 E

XAMPLE

2

ON

NAVIGATION

: S

ETTING

THE

DATE

AND

TIME

,

page 25)

Mount the stand
(see operating manual of the stand)