38ah044-084 dual-circuit and 38ah094-134 units, ~-r . -i – Carrier 38AH044-134 User Manual

Page 14

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

To achieve good mixing of the refrigerant leaving the evapo­

rator suction header for proper sensing by the TXV bulb:

1. Install a minimum of two 90-degree elbows upstream of

the TXV bulb location. See Fig. 14 (for 38AH044-084
dual-circuit and 38AH094-134 units) or Fig. 15 (for
38AH044-084 optional single-circuit units).

2. Locate the TXV bulb on a vertical riser, where possible.

If a horizontal location is necessary, secure the bulb at

approximately the 4 o’clock position.

3. Size the suction line from the evaporator to the common

suction line to achieve high refrigerant velocity. See

Tables 6A or 6B through 9A or 9B and Fig. 13.

If an oil return connection at the bottom of the suction

header is supplied with an evaporator, tee-in this connection
ahead of first mixing elbow. See Fig. 14 (for 38AH044-084
dual-circuit and 38AH094-134 units) or Fig. 15 (for 38AH044-
084 optional single-circuit units). When the compressor is
below the evaporator, the riser at the evaporator should ex­
tend to the top of the evaporator section. After the riser is

installed, the suction line can elbow down immediately.

Install a field-supplied filter drier and sight glasses in each

refrigerant system. Select the filter drier for maximum unit
capacity and minimum pressure drop. Figure 11 (for 38AH044-
084 dual-circuit and 38AH094-134 units) or Fig. 12 (for

38AH044-084 optional single-circuit units) shows required
location of solenoid valves and recommended locations for

the filter driers and sight glasses. Complete the refrigerant
piping from the evaporator to the condenser before opening
the liquid and suction lines at the condenser.

Table 5 — Liquid Lift

MAXIMUM LIQUID LIFT

UNIT 38AH

60 Hz

50 Hz

Ft

M

Ft

M

044

69

21 0

57 5

175

054

75

23 0

75 0

23 0

064

75

23 0

65 0

19 8

074

45

137

37 5

11 4

084

75

23 0

75 0

23 0

094

55

167

46 0

140

104

50

152

42 0

128

124

75

23 0

65 0

19.8

134

45

137

37 5

11 4

UNITS 38AH044-084 — Relieve the pressure caused by the

holding charge into a refrigerant recovery system. Uneap the

suction line and cut the run-around tube at the liquid line
as close to the loop elbow as possible. This will leave ap­
proximately 2 , in. (50 mm) of straight tube for liquid line
connection.

IMPORTANT: Protect the liquid valves from the heat
of brazing.

Leak test the entire system by using soap bubbles and

nitrogen or R-22 with an eleetronic leak detector.

Purge nitrogen or reclaim R-22 from system after comple­

tion of leak-checking procedure. Repair leak if one is found.
When finished, evacuate and dehydrate system using the meth­

ods described in Carrier GTACII (General Training Air Con­
ditioning II), Module 4, System Dehydration.

UNITS 38AH094-I34 — Relieve the R-22 holding charge
of each circuit into a refrigerant recovery system. Remove
the liquid line to factory-installed suction line loop by cut­

ting the loop at the liquid valve. (See diagram below and

Fig. 9.) Cut as close to the 90-degree bend in the loop as
possible. The remaining tube piece in the valve will be used

for brazing the liquid line. Unbraze and remove the cap from
the liquid line. For 38AH094 and 104 units, sweat-connect
the liquid and suction lines from the evaporator. For 38AH124
and 134 units, see Piping Kit Connections on page 21.

TOP VIEW

SUCTION

LINE

FACTORY-INSTALLED

SUCTION LINE LOOP

LIQUID

1---~-r . -I-

r _ r LINE

-CUT LINE

LEGEND

TXV

LOCATION A

LLS

— Liquid Line Solenoid

TXV

— Thermostatic Expansion Valve

Fig. 11 — Required Location of Soienoid Valves and Recommended Filter Drier and Sight Glass Locations for

38AH044-084 Dual-Circuit and 38AH094-134 Units.

14

Advertising