Final component installation – East Coast Supercharging Lysholm 2010+ Camaro Supercharger Kit User Manual

Page 89

Advertising
background image

P/N: 4LGE020-010 v1.1, 2011-04-29

© 2011 Lysholm

All Rights Reserved, Intl. Copr. Secured

79

A. Reinstall the Front Bumper Cover (FBC) in

reverse order from removal making sure to

reinstall:

1. Two (2) 10mm-headed screws through

the bottom of the FBC.

2. The FBC electrical connector located

between the passenger side driving light

and headlight. Access the connector via

the wheel well.

3. Four (4) 10mm-headed screws and one

(1) 7mm-headed screw attaching the

FBC to the leading edge of the fender on

each side (8 and 2 total).

4. Three (3) T20 Torx screws securing each

splash guard to the FBC (6 total). These

screws are located in the wheel wells

just forward of the front wheels along the

outer edge.

5. Two (2) plastic pins securing each

splash guard to the inner fender struc-

ture (4 total). One is adjacent to the

strut and the other is directly above the

wheel.

6. Two (2) 10mm-headed screws and six

(6) plastic pins along the top edge of the

FBC.

B. Slowly refill the engine coolant through the

spout located at the top of the radiator, allow-

ing any air to escape as the radiator fills. Fill

the engine coolant reservoir about 2/3 full.

Squeezing the upper radiator hose and the

air bleed hose, while you fill the radiator, will

aid with purging out the air from the system.

C. Using the washer fluid previously drained, fill

the washer fluid via the new remote fill spout.

Fill only so that the lower tank is filled.

Fig 10B

10. FINAL COMPONENT INSTALLATION

Fig 10C

Fig 10A

Advertising