Final check – East Coast Supercharging Lysholm 2010+ Camaro Supercharger Kit User Manual

Page 99

Advertising
background image

P/N: 4LGE020-010 v1.1, 2011-04-29

© 2011 Lysholm

All Rights Reserved, Intl. Copr. Secured

89

A. If your vehicle has gone over 15,000 miles since its last spark plug

change, you will need to change the spark plugs now before test driv-

ing the vehicle.

B. Check all fitting, nuts, bolts and clamps for tight ness. Pay particular

attention to oil and fuel lines around moving parts, sharp edges and

exhaust system parts. Make sure all wires and lines are properly

secured with clamps or tie-wraps.

C. Check all fluid levels, making sure that your fuel tank is filled with 91

octane or higher fuel before commencing test drive.

D. With the radiator cap still off, start the engine and allow to idle a few

minutes, then shut-off.

E. Re-check to be sure that no hoses, wires, etc. are near exhaust com-

ponents, sharp edges or moving parts. Look also for any signs of fluid

leakage.

F. With the radiator cap removed, start the engine and allow to idle bring-

ing the engine up to operating temperature. Watch the fluid level at

the radiator spout and fill as necessary.

G. Once the engine is up to normal operating temperature you can shut

the car off and replace the radiator cap. Check the overflow reservior

level and fill as necessary.

H. Check the CAC cooling system level and fill / purge as necessary. The

CAC surge tank should be 2/3 - 3/4 full after proper air purge. Do not

overfill.

I. PLEASE TAKE SPECIAL NOTE: operating the vehicle without ALL the

subassemblies completely and properly installed may cause FAILURE

OF MAJOR COMPONENTS.

J. Test drive the vehicle.

K. Always listen carefully for engine detona tion. Discontinue heavy throt-

tle usage if detonation is heard.

L. Read the STREET SUPERCHARGER SYSTEM OWNER’S MANUAL

AND RETURN THE WARRANTY REGISTRATION FORM within thirty

(30) days of purchasing your supercharger system to qualify.

WARNING:

Do not attempt to operate the vehicle until all components are installed and all

operations are completed including the final check.

12. FINAL CHECK

Advertising