Echelon i.LON SmartServer 2.0 Power Line User Manual

Page 106

Advertising
background image

92

Controlling a Street Lighting Network with the Scheduler Application

2. Click anywhere in the row under the Schedule, Event Time, Value, or Priority columns at the

time the event is to occur. The Edit Events of dialog opens. Alternatively, you can right-click a
time under the Time column or right-click the column to the right and click Add Event on the
shortcut menu to open the Edit Events of dialog.

3. Select the Show Sunrise/Sunset Functions check box to create events based on sundown and

sunrise times. A Function field appears in the dialog.

4. In the Function box, select the Sunrise (

) or Sundown (

) icon.

5. The calculated sunrise or sundown time appears in the Time box, which becomes read-only, and

an Offset field is added to the dialog.

Advertising