Echelon i.LON SmartServer 2.0 Power Line User Manual

Page 115

Advertising
background image

i.LON SmartServer 2.0 Power Line Repeating Network Management Guide

101

b. The schedule for the selected weekday date shows the lower priority rush hour events

(priority 255) that are scheduled before the OFF event at sunrise (priority 220), and it hides
the lower priority rush hour events scheduled after the OFF event. The schedule also shows
the lower priority rush hour events that are scheduled to occur once the OFF event ends at
sundown and resets the data point priority to 255.

Advertising