10

force.

Supply voltage, current and cos φ are quoted on the

motor plate that has to be kept within the electrical panel.

m

The motor must be earthed and connected to

the electric panel.

4.2 Verification of Rotation Direction
When the pump has been connected to the power supply,

establish the current direction of rotation as follows:

1. Start the pump and control the head provided with

gate valve not fully closed.

2. Stop the pump and interchange two of the phase

connections.

3. Start the pump and repeat step 1. with the gate valve

in the same position.

4. Stop the pump.

Compare the results obtained after performing steps 1

and 3. The correct connection is the one that gives the

highest head.

Note: The pump must not be started until the suction

support has been completely submerged.

5 . PUMP INSTALLATION

m

Before starting any work on the pump or on the

motor, make sure that the power supply has

been disabled and that it cannot be accidentally

switched on.

5 .1 Assembling of the pump with the motor
Place the pump on the motor in order that they are

positioned along the same axis and insert the motor shaft

in the pump shaft joint: the coupling must not be forced.

Tighten the screws or the nuts that diagonally fix the

pump-motor flanges with a driving torque as quoted in

the following table.

Motor type

Screw

Driving torque

Nm

Motor 4"

M8

18

Motor 6"

M12

100

Motor 8"

M16

200

5 .2 Delivery piping
If the pump is already coupled to the delivery piping and

you use a chain pipe wrench, tighten the pump, holding it

only by the delivery opening.

The threaded pipes must be connected in such a way as

to support the unscrewing action due to the starting and

stopping of the pump.

The thread of the pipe, which has to be screwed into the

pump, should not be longer than the thread of the pump.

After screwing the pipe into the delivery opening, tighten

the screw assembled to avoid the loosening of the first

section of the pipe, see Fig. 3.

When plastic pipes are used, the pump should be

secured by an unloaded rope to be fastened to the

delivery opening, see Fig. 3.

001

14016 09/2008

001

14016 06/2010

Fig. 3

5.3 Cable fitting
Use cable clips every 3 meters to fix the cable to the

support rope or to the delivery pipe.

Use plastic cable clips as shown in Fig. 4.

Once the cable has been fastened, cut off the remaining

part of the clip.

3mt

3mt

001

14019 09/2008

001

14019 06/2010

Fig. 4

In the case that the tube is plastic, it must leave the

electric cable and the cable support not in tension to

prevent the elongation of the tube, due to the weight of

the water contained in it, tearing the electric cable.