General, Dielectric test, Operational test procedure – Basler Electric BE1-50/51M User Manual

Page 43: Test equipment required, Section 5 • testing -1, General -1, Dielectric test -1, Operational test procedure -1, Test equipment required -1

Advertising
background image

9252000990 Rev R

BE1-50/51M Testing

5-1

SECTION 5 • TESTING

General

Dielectric testing, operational testing, and periodic testing are described in the following paragraphs.

Dielectric Test

In accordance with IEC 255-5 and IEEE C37.90-2005, one-minute dielectric (high potential) tests may be

performed as follows:
All circuits to ground:

2,828 Vdc or 2,000 Vac.

Input to output circuits:

2,828 Vdc or 2,000 Vac.

Output contacts are surge protected.

Operational Test Procedure

The following procedures verify operation of BE1-50/51M relays. The test setups of Figures 5-1 and

5-2 are intended primarily as an illustration of the principles involved. Other test setups known to be

capable of testing with the stated and implied tolerances (including equipment specifically designed for

testing relays) may be used.

Test Equipment Required

Current source with a range from 0 to 20 Aac (sensing input current)

AC or DC voltage source (target operation)

Timer or counter

CAUTION

When testing units with integrating reset characteristics selected, timing may

be affected by the integrating reset.


Advertising